EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
pbruce
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (105)
Research
- (1)
Workshop
- (3)
Empennage
Fuselage
- (28)
Firewall
- (1)
Tail Feathers
Wings
- (55)
-
Wing stands
-
Aileron close-out...
-
Nutplates for...
-
Control surface...
-
Hanging ailerons and...
-
Pop rivets removed...
-
Fuel tank 2nd wing
-
Wing root fitting,...
-
Bottom skins,
-
Bottom skin...
-
Riveting bottom skin on
-
Riveting bottom...
-
Inspection hatches
-
Inspection hatches
-
Inspection hatches,...
-
Wing skin stiffenners
-
aileron cables finished
-
Aileron cables
-
Fuel tank covers
-
Aileron pulley,...
-
Wing tanks, Checking...
-
Riveting wing skins...
-
Rivet Bottom skins...
-
Inspection hatch again
-
Inspection covers again
-
Inspection panels again
-
Pitot
-
Fuel tank cover...
-
Fuel tank cover...
-
Pitot tube
-
Inspection plates
-
Stiffeners
-
Install wiring...
-
Left wing Control...
-
Aileron cable fairleads
-
Flap alignment
-
Left Aileron and...
-
Left flap mounting
-
Aileron mounting
-
Aileron...
-
Left aileron
-
A
-
Left aileron
-
Left wing Aileron...
-
Aileron cable pulley...
-
Aileron pulley (again)
-
Aileron cable pulley
-
Inboard flap bearing
-
Flap inboard bearing...
-
Flap torque tube
-
Flap torque tube
-
Aileron cable...
-
Aileron bellcrank
-
Torqued factory...
-
Mounted wing on...
Controls
Avionics
- (2)
Lighting
- (1)
Instrument Panel
Landing Gear
- (2)
Engine
- (2)
Propeller
- (1)
Fuel System
- (1)
Interior Finish
Paint / Decals
Inspection
Tools
General
- (8)
Builder Name:
Patrick Bruce
-
Project:
Bearhawk - Patrol
-
VIEW REPORTS
Total Hours:
593
Total Flight Time:
5
Start/Last Date:
Mar 02, 2023 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=pbruce
Home or Last Project Picture
Feb 11, 2021
Pop rivets removed on 2nd wing aileron and flap
- (2 hours)
Category: Wings
Removal of pop rivets in skin gussets in preparation for mounting of hinges and control rods and flush riveting of skins. Minus 30 weather precludes working in the electrically heated garage. Last few weeks
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.